Most modular companies struggled on the business model, not the factory. A line only works when it is fed, and the cheapest way to feed it is to build many buildings in one city.

The factory was never the hard part

Volumetric construction has been proven for decades. Steel modules can be welded, finished and inspected indoors to a standard that field construction rarely matches. What has struggled, repeatedly, is the business around the factory: a plant that depends on outside developers for work, each with a different design, a different schedule and a different idea of what the module should be.

A factory selling custom modules into someone else’s process is a custom shop with expensive overhead. Utilization collapses between projects, storage costs pile up, and every design change lands on the line.

A single project is a custom job with a factory attached

The unit of economics in industrialized housing is not the building. It is the market. One project, however well designed, cannot keep a line loaded for a year. Five to ten projects in the same city can.

Clustering changes four things at once:

  • Factory utilization. The line never waits for the next contract. Modules for the next building start while the current one is being set.
  • Crew and logistics. Short hauls on standard flatbed trucks, one set crew moving site to site, the same lifting sequence every time.
  • Municipal familiarity. Inspectors and agencies see the same chassis, the same details and the same connections project after project.
  • Operations density. One operations team and one software platform across many buildings in one metro.

Why Domo starts in San Diego

Domo’s first market is San Diego, California: a factory, about 1,100 permitted units across eight projects, one community built and in lease-up, and a second in production. The projects share one standard chassis, one bill of materials and one line sequence, so each building is a repeat of the last at a slightly lower cost.

That is the whole point of vertical integration. Design, manufacturing, construction and operations share one data set and one incentive, because Domo owns and operates what it builds. The next building is cheaper and faster than the last.

What this means for partners

For lenders, a clustered pipeline on a standard product means variance falls after the first project in a market. For cities, it means a housing producer that stays. For suppliers, it means repeatable volume. The factory is the visible part of the system. The pipeline is what makes it work.

Published by Domo Modular · San Diego, California All insights

More from Domo

  • More articles coming.
Work with Domo

Building the housing system the next decade needs.

Domo is in production, permitted and operating in San Diego, and expanding across the Southwest.